Menu

Terrebonne/Since 2008

Home renovation in Terrebonne and on the North Shore

JTMGSL

4.9 out of 5 from our clients

One point of contact, from the first sketch to the last coat of paint.

Renovated white bungalow
Renovated split-level home, brick and cedar

Our story

Marc Bélanger started alone in 2008, with a pickup truck and a reputation to build. The first contracts were bathrooms for neighbours in Terrebonne. Word of mouth did the rest.

Read our story

18

Years in business

350+

Projects delivered

6

Cities served

5 yrs

Written warranty

  • Kitchens
  • Bathrooms
  • Basements
  • Additions
  • Flooring
  • Doors and windows

Ballpark figures

What a renovation usually costs

Honest ranges, before the first call. The detailed quote comes after the visit.

Renovated kitchen, marble island and black cabinets
  • Complete kitchen

    $35,000 to $70,000

    Cabinets, countertops, plumbing, electrical and flooring.

  • Bathroom

    $18,000 to $40,000

    Walk-in shower, vanity, tile and heated floor.

  • Basement

    $25,000 to $60,000

    Insulation, partitions, flooring, lighting and a powder room.

  • Addition

    $250 to $400 per square foot

    Foundations, structure, envelope and interior finishing.

Indicative ranges, taxes extra.

Request a quote

Projects

From sketch to handover, here is what we've built

Kitchen opened onto the living room
Kitchen opened onto the living room
Spa bathroom
Spa bathroom
Deck and patio
Deck and patio
Family basement
Family basement
Contemporary home
Contemporary home
Bright open plan
Bright open plan

Our values

What guides every job, every quote and every call

Clean

The site is protected, swept every evening and left the way we found it.

On time

A start date, an end date, and a call if anything moves.

Precise

A detailed quote, line by line. No extra that was not approved first.

Guaranteed

RBQ licence 5678-1234-01, liability insurance and a 5-year written warranty on the work.

Contemporary addition lit at dusk

Ready to renovate without the surprises?

Detailed quote within five business days. Visit, measurements and advice, no commitment.

How we work

Four clear steps, from first call to handover

  1. Visit and quote01

    Visit and quote

    We come to you, measure, listen. Detailed quote within five business days.

  2. Plans and choices02

    Plans and choices

    Materials, colours, schedule. Everything settled before the first hammer blow.

  3. The work03

    The work

    A dedicated crew, a reachable project manager, a clean site every evening.

  4. Handover04

    Handover

    Inspection together, touch-up list, five-year written warranty.

Client reviews

What our clients remember about the job

4.9

Average rating out of 5

« Quote kept to the cent, site swept every evening. We got our kitchen back five weeks later, as promised. »
JTJulie TremblayKitchen, Terrebonne
« The project manager answered the same day. One surprise along the way, and they explained it before going on. »
MGMartin GagnonBathroom, Mascouche
« We compared three quotes. Not the cheapest, but the clearest. No regrets. »
SLSophie LavoieBasement, Laval

Common questions

How long does a kitchen renovation take?

Four to six weeks of work for a complete kitchen, once the cabinets are delivered. Cabinet lead time comes before that, usually six to eight weeks.

Do I need a permit to renovate?

Not for a kitchen or bathroom without structural changes. For an addition, a basement converted into an apartment or a load-bearing wall, yes. We handle the application.

How does payment work?

A deposit at signing, instalments at agreed milestones, and the balance at handover, after the inspection together.

Are you insured and licensed?

Yes. RBQ licence in good standing, liability insurance and a five-year written warranty on the work.

All templatesPreview of the Clean Line template, with a fictional company.
Choose this template